
Medina, WA
Home Remodeling in Medina, WA
Design-build kitchen, bath and whole-home remodeling for Medina, Hunts Point, Yarrow Point and Evergreen Point.
Your Trusted Remodeler in Medina
Medina is not on MyBuildingPermit. While Bellevue, Kirkland and Mercer Island all file through the shared Eastside portal, Medina runs its own permitting portal through its Development Services department, with its own coordinator and its own submittal requirements. Hunts Point, Yarrow Point and Evergreen Point are separate incorporated towns with their own counters again, even though the mail all says 98039. A contractor who has only worked in Bellevue will find that out after submitting.
Medina is really two housing stocks with a teardown line between them: pre-war and mid-century originals, and the houses that have replaced them, with little in between and the largest lots on the Eastside under both. So the first question here is usually whether to restore or to replace, and it is worth answering before anyone falls in love with a drawing. Two local rules then catch remodels nobody budgeted for. Tree removal is its own permit, separate from the building permit, so a plan that relocates a driveway or widens a footprint can stall on an arborist report. And anything inside shoreline jurisdiction falls under the city's Shoreline Master Program, where an existing nonconforming footprint — not your wish list — is what limits a waterfront addition.
Why Medina Homeowners Choose Us
Real numbers
What a remodel costs in Medina
Validated 2026 Eastside design-build ranges. Where a range is missing below, it is missing on purpose — we would rather publish nothing than a number we cannot stand behind.
Kitchen
$75k–$300k+
Refresh in the existing footprint at the low end; full gut with custom cabinetry or a layout change at the high end.
Kitchen in Medina →Bathroom
$35k–$120k+
Guest bath keeping the layout through to a spa-grade primary with the walls moved.
Bathroom in Medina →Whole home
$450k–$1M+
Typically 2,000–4,000 sq ft taken down and rebuilt on one coordinated schedule.
Whole home in Medina →ADU
$350k–$650k+
Detached or attached, including drawings, engineering and permits.
ADU in Medina →Addition
Priced from the drawings
Square footage alone does not predict an addition — the foundation, the roof tie-in and the structure do.
Addition in Medina →Basement
Quoted after a walk-through
Depends on how much is already framed and roughed in. Finishing an existing shell costs far less than adding the same square footage.
Basement in Medina →We quote from a measured set of drawings, never per square foot. Preconstruction runs as its own contract — drawings, structural and mechanical engineering, and the permit set — so you see real scope and a real number before committing to the build.
Our Services in Medina
What We Do in Medina, WA
From kitchen remodels to whole-home renovations, we bring expert craftsmanship to every project in the Medina area.

Kitchen Remodeling in Medina
Design-build kitchens for the Eastside. We plan the layout, draft the structural and mechanical, then build it ourselves. One team — sketch to last tile.

Bathroom Renovation in Medina
Design-build bathrooms for the Eastside. Master baths, ensuites, and primary suite remodels — we draw the layout, run the plumbing and mechanical, then build it. One team, no handoffs.

Full Home Renovation in Medina
Whole-home design-build for the Eastside. Kitchens, baths, structural changes, and finishes — planned and built by one team. Two contracts: preconstruction, then build. No middlemen.

ADU Construction in Medina
Add an Accessory Dwelling Unit to your property for rental income, family, or a home office.

Home Additions in Medina
Design-build additions for the Eastside. Bump-outs, sunrooms, and second-story builds — we draw the structural and mechanical, then build it. One team across both phases.

Basement Finishing in Medina
Transform unfinished space into beautiful living areas that add comfort and value to your home.
Permits
How permits work in Medina
City of Medina Development Services issues the permit, filed through Medina's own permitting portal. Review time belongs to the jurisdiction, not to us — we handle the submittal and tell you what the queue actually looks like.
Medina's own permitting portal- Medina is NOT on MyBuildingPermit — it runs its own portal and its own submittal checklist.
- Tree removal is a separate permit from the building permit.
- Shoreline jurisdiction work runs through the Shoreline Master Program; nonconforming footprints limit additions.
- Hunts Point, Yarrow Point and Evergreen Point are separate towns with their own permit counters.
Our Work
Recent Projects Near Medina
These are nearby Eastside projects, not Medina addresses.

White Kitchen with Dark Island
An elegant kitchen featuring white shaker cabinets, dark contrasting island with wine cooler, quartz countertops, marble backsplash, and recessed tray ceiling.

Spa-Inspired Freestanding Tub Bath
A serene spa bathroom with freestanding soaking tub, walnut vanity, gray stone tile, glass-enclosed shower, and natural skylight.

Gray & Marble Transitional Kitchen
A transitional kitchen with white and gray cabinetry, marble herringbone backsplash, globe pendants, and garden views.
Questions
Medina remodeling questions
- Do you work in Medina, Hunts Point and Yarrow Point?
- Yes. Medina 98039 is inside our service area, along with Hunts Point, Yarrow Point and Evergreen Point. We are based in Redmond, about twenty minutes away.
- What does a kitchen remodel cost in Medina?
- Eastside kitchens run $75k–$300k+. Medina projects are usually in the upper half of that, because the finish level and the cabinetry spec are higher, not because of the ZIP code. We price from the drawings, not per square foot.
- Who issues the building permit in Medina?
- The City of Medina, through its own Development Services portal. Medina is not on MyBuildingPermit, so the submittal package and the review queue are different from Bellevue's. Tree work is a separate permit.
- Can I add on to a waterfront home in Medina?
- Sometimes, and the limit is usually the existing footprint rather than the design. Shoreline jurisdiction work runs through the Shoreline Master Program, and expanding a structure that is already nonconforming is the question that decides the project. We check that before anyone pays for drawings.
Get Started
Ready to Transform Your Medina Home?
Book a free walkthrough. We see the project in your Medina home, then at a second free meeting show you your layout in 3D with one honest total, before you sign anything.
